Incoming material
Heat / lot / certificate reference captured as illustrative demo fields.
FORMA Works / Proof Lab 030
Bandingkan proses, material, tolerance, dan window produksi dengan catatan yang cukup untuk memulai RFQ yang masuk akal.
01 / Capability matrix
Procurement does not need a louder promise. It needs a calmer comparison between process, material range, tolerance, finish, and the window each choice can protect.
02 / Material selector
Light, machinable, and a clear choice for housings that need a controlled finish without excess mass.
03 / QA trace
Follow an illustrative trace from incoming material to release. The shape is simple on purpose: useful enough for a first conversation, honest enough to be replaced with real records.
Heat / lot / certificate reference captured as illustrative demo fields.
Setup, tool path, bend sequence, or turning program attached to the work order.
Critical dimensions and finish points sampled against the drawing revision.
Review note and pack-out instruction prepared for the next team.

04 / Production case
The first enclosure trapped heat, showed too many fasteners, and needed a smaller revision loop before a pilot run.
CNC-milled aluminium shell + bead-blasted face + a measured sheet-metal bracket.
Critical bore held within the illustrative ±0.05 mm band across the sample set.
05 / Capacity bands
These are planning bands for a demo interface, not live inventory. Volume changes the explanation because process risk and inspection cadence change with it.
One or two revision loops, first article inspection, and a clear handoff package.
Process tuning, fixture check, and a repeatability sample before the larger run.
Capacity planning, inspection cadence, packaging route, and a controlled release plan.
06 / RFQ configurator
Pilih proses, material, volume, target date, dan kesiapan file. Konfigurasi ini memengaruhi catatan capability, lead-time, dan pesan RFQ.
3—5 weeks / One or two revision loops, first article inspection, and a clear handoff package.
Title block / end of proof